Belinda Cape, of State Senator Dan Squadron's office, has been monitoring this for us. She reports that signals and all-way stops were last denied at Columbia and Carroll on 8/25/2010 and at Columbia and President on 1/13/2011.
New requests will be considered 18 months from the end of the studies: therefore the dates of eligibility for further study are: President and Columbia,7/13/2012 and Columbia and Carroll, 2/25/2012.
DOT has active study for Columbia and Summit for a temporary signal - we should be hearing the results of that shortly.
No comments:
Post a Comment